Bono Consulting Civil Engineers provided construction assistance throughout construction including survey layout of concrete curbing, storm structures, and grades for sub-base and top of stone. Our inspectors observed the excavation of unsatisfactory sub-base; installation of storm sewers, geotextile separation fabric and under drains; placement, compaction and proof rolling of CA-7 and Vulcan 210 stone; inspection of concrete formwork and concrete placement; asphalt placement and compaction, turf installation and goal post installation. Final grading inspection and MWRD inspections. Prepared final as-built survey. Attended weekly team progress meetings with school board, GC, and subcontractors throughout the project to assist with keeping the project on schedule.
Project status: Construction of Athletic field was completed in September 2009.