Bono Consulting was retained by the Village of Glenview to provide detailed engineering, topographic survey and construction assistance for this water main reconstruction on Tanglewood Drive. It was a rush project and the total elapsed time from design initiation to water main construction was four weeks.
Permits were required from IEPA.
Project status: Project was completed in 2006.