SITE REGRADING AND STORM WATER DETENTION AT ROEMER PARK BASEBALL
FIELD, WILMETTE
Bono Consulting provided detailed engineering design for this renovation to an existing park. The existing drainage was flowing through the park to the rear yards of some adjacent houses. The proposed regrading intercepts this runoff and routes it to an on site detention area for connection to the Village Storm Sewer system. The base of the detention area was covered with gravel to provide overflow parking.
Project status: Project is scheduled for construction in 2010