Cement Mason’s Training Facility – Bellwood, IL

Local 502 Cement Masons hired Bono Consulting to provide engineering design, a topographic survey, and construction assistance for a new state-of-the-art training facility. The project required stormwater detention and infiltration to comply with the MWRD WMO stormwater regulations. A shallow gas main was found during construction while installing the storm sewer, forcing us to alter our design plans. We quickly put together an altered sewer design to ensure construction progress with minimal downtown, in the end saving our client money.

Permits Required: MWRD & IDOT